PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Pouring concrete at Elev. 5,6 (4th Floor) Facing North-West (800x600).jpg Started installing rebar at Elev. 4-Stair -2 Facing South-West (800x600).jpg Welding beam connections at Monumental Stairs column Facing South -2 (800x600).jpg Welding beam connections at Monumental Stairs column Facing South (800x600).jpg Conduit by the Administration building (800x600).jpg Excavating at Rahway Ave. for the underground Tele-Data Facing the Administration Building (800x600).jpg Installed manhole by the administration building (800x600).jpg Installing a manhole at Rahway Ave. Facing the new Court Building (800x600).jpg
Previous pageNext page Welding beam connections at Monumental Stairs column Facing South (800x600)
Welding beam connections at Monumental Stairs column Facing South (800x600)